Case study

Fewer Shortages, Realistic Schedules with SAP PP/DS and MRP

Material planning and detailed scheduling in SAP, so production plans reflect real capacity and shortages are seen before they stop the line.

IndustryManufacturing (electronics)
ServicesSAP PP/DS, MRP
Production planningMaterial requirements plannedShortages flagged earlyCapacity-aware schedulesBottlenecks visiblePlanners work from one planChanges handled quicklytechcarvings.comSAP S/4HANACapacityPP/DSMRP

Overview: planning complex, high-mix production

This case study shows how TechCarvings implemented SAP PP/DS and MRP for a precision electronics and electromechanical manufacturer. The company builds complex, high-mix products with long component lead times and demanding quality requirements.

Planning had to account for many components, shared machines and frequent changes. Doing that in spreadsheets meant plans were often out of date by the time they reached the shop floor.

Operational challenges

Planners worked hard, but the tools did not reflect reality.

  • 1

    Material shortages. Missing components were often discovered when production was about to start.

  • 2

    Unrealistic schedules. Plans assumed unlimited capacity, so the shop floor re-planned informally.

  • 3

    Spreadsheet planning. Planners spent hours updating files instead of solving problems.

  • 4

    Slow response to change. Customer changes and supplier delays took too long to reflect in the plan.

  • 5

    Excess stock in some places. While other components ran short.

The transformation: what the company wanted

Operations and planning leaders agreed four goals.

See shortages earlybefore they stop production.
Plan to real capacitymachines and lines, not assumptions.
One planused by planning, purchasing and production.
Respond fasterto customer and supplier changes.

The solution: SAP PP/DS and MRP in SAP S/4HANA

TechCarvings set up MRP to plan materials accurately and PP/DS to schedule production against real capacity, both inside SAP S/4HANA.

01

Master data clean-up

Bills of materials, routings, lead times and lot-sizing rules reviewed and corrected, because planning is only as good as its data.

02

MRP

Material requirements planned from demand, with clear exception messages for shortages and rescheduling.

03

PP/DS detailed scheduling

Production orders scheduled against the actual capacity of machines and lines.

04

Bottleneck visibility

Planners see overloaded resources and can move work before it becomes a problem.

05

Planning workspace

Fiori apps that help planners manage exceptions instead of rebuilding plans.

06

Purchasing alignment

Purchase requisitions and dates follow the plan, so buyers chase what really matters.

Shop-floor scheduleCapacity-aware sequencePP/DSDetailed scheduling against resourcesMRPMaterial requirements and shortagesDemandCustomer orders and forecastsExecutionDemand
SAP PP/DS and MRP: From demand to a schedule the shop floor can follow.

Technology used for this SAP PP/DS and MRP project

SAP S/4HANAMRPPP/DS (embedded)Production planning (PP)SAP Fiori planning apps

Learn more on SAP.com: SAP S/4HANA.

How we delivered

The project began with master data, because accurate bills of materials, routings and lead times are the foundation of any plan. TechCarvings then configured MRP and PP/DS and tested them with real orders and resources.

Planners were trained to work by exception, and the new process ran alongside the old one until the team trusted it.

1AssessPlanning processand data2Clean dataBOMs, routings,lead times3ConfigureMRP and PP/DS4TestReal orders andresources5Go liveTrain planners,run by exception
How we delivered SAP PP/DS and MRP: good planning starts with good data.

Business impact

Planning now reflects what the shop floor can actually do.

Shortages seen early

MRP flags missing components while there is still time to act.

Realistic schedules

PP/DS plans against real capacity, so fewer plans are rewritten on the floor.

Planners solve problems

Work by exception replaces hours of spreadsheet updates.

One plan for all

Planning, purchasing and production work from the same schedule.

What’s next

With SAP PP/DS and MRP running, the company can extend planning further, for example into supplier collaboration and advanced analytics.